alabama power service pole requirements

Please have your account number, social security number or phone number available when you call. Find out all the reasons why you might be a good fit for our team. Usually it's 60 amp. When retrofitting an existing lighting system, high overall light levels can be reduced when good task lighting is installed. Pay Using Your Credit Card- Pay instantly via credit card by using our BillMatrix service. In a surprisingly large number of cases, building owners have been able to pay back the cost of window film installation directly from energy savings. Select the link in the email to continue the password reset process. Over the past several years, there has been a drastic increase in the number of companies requesting to attach to pole lines in both rural and metropolitan areas. Depending on the version and brand of your browser, default privacy settings may need to be changed in order to log in to our applications. Replace your 10- or 20-watt incandescent lamps in exit signs with LEDs. Physical address of home in which you need power. For more information about RECs visit the EPAs website. Use the envelope included with your bill if possible. Electric Service. Your User Profile is where we store your settings when you use our website to access your account. Gas mains. Lightning arrestors protect the pole and equipment We'll be using a 30 AMP 120. Download a wiring diagram in Adobe PDF format here. Pay in Person- Visit alocal authorized payment locationto pay your bill. Large Debris / Yard Refuse Collection. Your meter is read at approximately the same time each month, but most likely not on the same day each month. All meter sockets shall be mounted in a manner that allows meters to be inserted and withdrawn I also can't find any specific wording disallowing it either. Alabama Power is one of the most respected companies in Alabama. Contact us today. All of our rate plan information can be found on ourPricing & Ratespage. equipment on the Pole, and the highest communication cables or equipment. See Figure 5 and Detail B. You can mail your power bill payment to: PO Box 242, Birmingham, AL 35292. You will need your account number and web access code, social security number/Tax ID #, or email address. Read this complete Alabama Code Title 37. During the cooling season, long-wave infrared radiation from outside the facility is blocked before it can pass through the glass, thus reducing the cooling load. Some utilities companies will also set-up the temporary pole for an additional fee. Thats why we offer energy-related products and services specifically designed for commercial and industrial customers. The standard height of power lines depends entirely upon the city and state they're in and the types of power lines on the pole. This longer life not only cuts down on replacement component costs but also reduces the associated labor expense to replace them. 6. Must have been an Alabama Power Customer for at least 12 consecutive months. 2003 IRC E3501.6.2. Alabama Powers Renewable Energy Certificate (REC) program is called Greener State. SSL applies encryption between two communicating applications, such as your PC and our corporate server. We value our employees because we realize that every job and every employee who performs it is vital to the overall success of our company. View what is required for each service we offer. Daylighting control systems are particularly well suited for use in facilities with large areas of exterior glass. Please note that we will not be able to provide next day service for new service requests requiring installation or other construction work (digging, etc.). The ooperative will supply, install and own the service drop to the pole and the service wire attachments on the pole. Our experts can help you select strategies, which provide enough savings to justify their expense. Always be sure to include your payment stub, and write your account number on your check. Power Delivery Engineer Poles may be wood, steel, aluminum, or concrete. Even in hot, humid climates, you can increase the chilled water supply temperature and still maintain building comfort year-round. Use constitutes acceptance of General Website Terms and Conditions. TEMPORARY SERVICE Temporary service is very helpful at construction sites. You can apply forelectric service online. To avoid losing efficiency, calibrate pneumatic thermostats every three to six months. Entrance cable to Mobile Home 8' Min. Sewage Guying of the meter pole may also be required for additional support; taller poles may be required to obtain proper code clearances. Explore Alabama Power's most frequently asked questions and the corresponding answers for our Residential services. GROUND. Pole shall be braced Alabama Power is one of the most respected companies in Alabama. Where open-conductor wiring on feeder poles are used for power distribution, a continuous . You can begin the process to get your electric service started on ourElectric Service Requests. Meter Can and Cabinet In gen-eral, it consists of an imaginary box, 30-inches square, extending at least 40 inches above the highest communications cable or other facility and 40 inches below the lowest communications Ala. Code 11-50B-10 (2002): Public providers may exercise all powers of eminent domain as they are conferred on Alabama municipalities. Residential & Commercial. Thats why we offer energy-related products and services specifically designed for commercial and industrial customers. Insulate exposed hot-water, steam and chilled-water distribution piping and valves where feasible. Descriptions of any access problems such as locked gates, dogs, etc. To improve the thermal-insulating characteristics of aluminum frame windows, request that the window must include a thermal break, which is an insulating section placed between the inner and outer aluminum sections of the frames. Service entrance conductors shall be enclosed in a listed (for instance: UL) rigid galvanized steel type raceway for mast-attachment of overhead service cables. Use constitutes acceptance of General Website Terms and Conditions. Use the form below to contact the Joint Use team for inquiries about attachments, a listing of approved contractors, or trouble accessing the JUMS application. Position pedestal so that electric meter is faced toward the street or right of way. You can download a printable PDF version of your current and past bills from our website: You will not receive a paper bill if you are enrolled in Paperless Billing. Call Us Main Office/Member Services 256-737-3200 or 800-242-1806 To Report a Power Outage 256-737-3201 or 800-242-1806. website, or by calling our member service department at (800) 837-3374 or (251) 989-6247. Your e-mail inbox is full and unable to receive the e-mail. To improve cooling tower efficiency, lower the cooling tower fan horsepower by adding surface area and free area within the tower fill. Alabama Power remains committed to developing smart energy solutions that address our customers' future energy needs through high efficiency technologies, innovation and safe, clean renewable resources. When a REC is bundled with 1,000 kWh of energy, that 1,000 kWh becomes classified as green or renewable energy. Foley - (251) 943-5001 Daphne - (251) 626-5000. March 2021 EDUCATION 1954-59, The Neighborly Substation the Neighborly Substation Electricity, Zoning, and Urban Design, University Corridor 2013 Major Thoroughfare and Freeway Plan Amendment Request, California Pacific Electric Company, Llc (U 933-E) Utility Supplier Diversity Program Report for Calendar Year 2011, AUGUST 23, 2019 Shows a Map of the Corridor and Study Area, Which Includes One-Half Mile to Either Side of Verm:Mt Avenue, Increasing Bus Transit Ridership: Dynamics of Density, Land Use, and Population Growth, 1981 Caltrans Inventory of Pacific Electric Routes, Network Rail a Guide to Overhead Electrification 132787-ALB-GUN-EOH-000001 February 2015 Rev 10, Next Steps from Admission to Enrollment Transfers, Railroad Electrification Activity a Summary Report, White Flint Substation New U/G 69Kv Lines, Total Ua Calculations for Exterior Walls Template Instructions, Cost-Benefit Evaluation of Underground Versus Overhead Power Lines, December 31, 1936 Mr. Latimer Mr. Schreiber the Status of the Pacific, A Century of Fighting Traffic Congestion in Los Angeles 1920-2020, City Within a City GREATER U STREET HERITAGE TRAIL, Overhead Electric Line Construction STATE of CALIFORNIA ______RULES, Enhanced Transit Services Briefing Report, Railway Electric Power Feeding Systems Yasu Oura, Yoshifumi Mochinaga, and Hiroki Nagasawa, Pbm-04/U Bi-Stable Volt Free Relay Service Manual, Transit Project Funding and Delivery September 30, 2019 CTC Transit Workshop Transit Funding (SANDAG), U 39 San Francisco, California Revised Cal. Thats why we offer energy-related products and services specifically designed for commercial and industrial customers. Electric Transportation Business Programs. Single Phase Underground Service Entrance (200 Amp or Less) Single Phase Underground Service (400 Amp) 200 Amp Meter Pole Installation 100 Amp Meter Pole Installation 60 Amp Temporary Pole Installation Conduit Installation for 3 Phase Open Delta 120/40 Volt Transformer 3 Phase Transformer Pad Installation C.T. Arab Electric Cooperative Arab AL. Once the temporary electric service pole is securely installed, the temporary electrical panels can be secured to poles. Use constitutes acceptance of General Website Terms and Conditions. Once you have successfully accessed your account information for the first time, we will store that account in your User Profile. Operating chillers at peak performance will save energy and maintenance. entire plat map with the above requirements redefined. Additionally, our site requires that you choose a unique user ID and password. Explore and learn all the ways we are working to improve your life. We may have the incorrect e-mail address for your bill account in our database. Sheet No, Voltmeter, Meter Me-30A/U and Voltmeters, Electronic Me-30B/U and Me-30C/U, Electrification Systems Technology Assessment December 2010 APPENDIX 6, Gentrification and Displacement Near Los Angeles Rail Transit Stations: New Evidence on Income Distributions and Moves Into and out of Station Areas, S-Bahn, U-Bahn, Regionalzug, Tram Und Expressbus Im MVV, A Novel Co-Phase Power Supply System for Electrified Railway, Union County Resident for 47 Years an ORAL HISTORY, Starkey Unit a Ilc H N K Er D N Fk Anthony E C E E 0 R 8 Campground R, Expand Long Template PCR System Deoxynucleoside-Triphosphate: DNA Deoxynucleotidyltransferase, E.C, Evaluating Public Transit Benefits and Costs Best Practices Guidebook 31 August 2021, Gendertes Liniennetz Tram Mnchen Wegen Bauarbeiten, Alabama Power Company Rules and Regulations for Electric Service, In the Station Union Station by Rail Union Station By, Falling from Favor: the Demise of Electric Trolleys in Los Angeles, ATLET Truck Model and Capacity AH/ IST Battery Dimensions (In.) For more than 100 years, Alabama Power has acted as a reliable resource for business and a trusted partner in economic development. Notify a Baldwin EMC member service representative at (251) 989-6247 when your wiring is complete. When specifying piping insulation, look at both the maximum temperature it will be exposed to and the minimum temperature. Residential customers can enroll inPaperlessBilling, Auto Pay, Budget Billing, and Project Sharethrough theOnline Customer Caresection of our website. Our site is currently tested to work with the most commonly used versions of Internet Explorer, Firefox, Safari, Edge and Google Chrome. You can verify that your email address on file is correct under the My Contact Information section of theMy Accountpage (lower right corner). No - you will only be required to have your account number and web access code the first time you try to access your account information online. We welcome your suggestions on how we can improve our service to you! Your code is a unique identifier that we print on your bill that allows us to ensure that only you have access to your account information online. We use Secure Socket Layer (SSL) for secure transmissions whenever we ask for or display information about your account. Light energy can be controlled using overhangs to shade windows, shading glass surfaces, and using glazing material for exposed window surfaces. Alabama Power offers a variety of products, programs and tools to help you save money and energy in your home. Although individual components of the HVAC system, such as the chiller, may be quite efficient, the overall system may contain inefficiencies that need to be fixed. Energy Efficient Appliances Save money on electronics and appliances in our Appliance Center. Please verify you are logging into our system with the correct username and password. To remove your account from the Paperless Billing service, click the edit link next to Bill Delivery under the Current Account Settings section of theMy Accountpage to access the Bill Delivery Options page or click the Paperless or Paper link under the billing section in the left navigation. My power is out, how do I contact Alabama Power? The initial cost of a state-of-the-art system may even be lower than the overall cost of a less expensive and less efficient system if you use fewer fixtures to achieve the same or better light levels, and if you can tap into utility rebates and other incentives. Purchasing RECs is a way for individuals and businesses to support renewable energy development. Certain e-mail spam filters could be blocking our e-mail. Pole-mounted service entrance cable straps shall be installed at the weatherhead, 12 inches from the weatherhead, 12 inches from the meter socket, and at 30 inch intervals. BRACING SHALL BE SET BACK A MINIMUM OF 6' FROM POLE. Apply at our office located at 3196 County Hwy 55, Hamilton, AL 35570. Encourage employees to turn off computers, monitors, printers and copiers when they are not being used. Many areas can be sealed with a caulk gun and tubes of silicone or urethane caulking. NESC 236 CLIMBING SPACE Climbing Space is an unobstructed, vertical space along the side or corner of the pole. If you are required to pay a deposit on your residential account, you are eligible for a refund once you make the payments on time for 12 consecutive months. Log into your account, then select the My Contact Information in the left navigation. Other methods for controlling heat flow include selecting the correct materials for the walls and roof and using natural ventilation and landscaping. To apply at our office, you must bring: A photo identification. Metering Installations for Mobile Homes or Mobile Home Parks: Overhead Installations The metering pole must be a minimum of 17 ft, Class 5 pole set at least 4 ft deep so that it will be of sufficient height and stability to provide service drop clearances as shown on page 31. Relocate thermostats, install fans to keep hot air off the ceiling, and install thermostats in hot water tanks. Social security number. Shop now! You will need to call your utility company and ask about the procedures for applying for temporary power. We value our employees because we realize that every job and every employee who performs it is vital to the overall success of our company. Payment Assistance for Your Power Bill We have several programs to assist you in paying your power bill. Electric units lose 1%. Our crews have the experience, resources, and equipment to provide you with the temporary power system you need. You will need to provide us with the following information: We can connect your electric service Monday through Friday (service connection is not available on weekends). Much of this cost is offset because of the longer life. SERVICE HEADS shall be located high enough to provide the required vertical clearance of Sam Houston Electric All meter sockets shall be mounted in a manner that allows meters to be inserted and withdrawn To improve chiller performance, monitor outside air temperature and humidity to control chilled water supply temperature. If a deposit is required, you do have the option of having a guarantor sign with you. You can make aone-time payment onlineusing your checking or savings account. We determine the number of kilowatt-hours used monthly by reading your power meter. Explore and learn all the ways we are working to improve your life. A crossarm holds the wires up on the pole. If you already have an agreement with us and need to apply for a new attachment, please use the JUMS Application button above. We value our employees because we realize that every job and every employee who performs it is vital to the overall success of our company. To cancel a payment, you will need to call Customer Service at 1-800-245-2244. 100 to 300 feet. construction power poles.Be sure to tamp the pole solidly in the ground. A payment cannot be cancelled if it has already been sent to the bank for processing. Recent Articles. Replace them with high-pressure sodium or metal halide lamps. This service shall be installed at a location mutually agreed upon by the member and the Cooperative. strickland funeral home pooler, ga; richest instagram influencers non celebrity; mtg bees deck; business for sale st maarten This would cost you an additional $12.50 per month on your power bill. All service entrance equipment shall be supplied and installed on the pole by the member. Top Stories from Alabama News Center Community 9. House footer may be notched to allow the conduit to go straight down or one (1) 45-degree bend may be used to go around the footer. 3. Service Entrance Cable Sizes Aluminum---#2 Copper--#4 100 AMP Meter Socket 100 AMP Main Breaker Panel 11/4" Pipe Nipple 2" Conduit . xw|T0>92=dJ2@$HUBo*"` MP,W!y>3F|sueU#!zgC tzFw!1!w7}?D(&F # @>y]NA%B9n`T{/|]I{| Ms0 e2B}01H@t_ r2 !i8Bwgx+'|D==Cw$qz'I#N5IISv$yI xr. may save plenty of energy but may also require a higher premium at relamping or reballasting time. However, electricity use varies widely depending on the season and the size of your home, which is why your meter is checked before a bill is generated. Intro Rates Vegetation Management Construction Specification. EVs have lower life-cycle costs, saving up to $6K annually per vehicle. Shutting down unnecessary auxiliary HVAC equipment improves system efficiency without impacting performance. The Alabama Power Company located in Calera AL is an utility company that. Our scheduling system provides a 4-day window to read your meter. Complete the form or call our Business Service Center at 1-888-430-5787. There are several reasons your lights might blink during a storm, but the most common cause is tree movement. The pole must be located to where the service drop to the pole will . A temporary service is defined as a service that will be in place for 2 years or less and is typically used for temporary power for construction purposes. If you have questions about terms for use of this site, please review ourpolicy page. Please refer to the specifications on page 11. Get rid of mercury lamps inside and outside a building. Explore the ways we provide reliable, affordable electricity to 1.5 million homes, businesses and industries in the southern two-thirds of Alabama, while protecting the extraordinary natural resources of Alabama. 1 0 obj <> endobj 2 0 obj <> endobj 3 0 obj <> endobj 4 0 obj <>/Type /Page>> endobj 5 0 obj <> endobj 6 0 obj <> endobj 7 0 obj <> endobj 8 0 obj <> endobj 9 0 obj <> endobj 10 0 obj <> stream 2. The more artificial lighting is used, the greater the heat load imposed on the air conditioning system from lamps and ballasts. Quotes your engineering job (where applicable). Electrical Service Requirements for Mobile Home Developments EMWP Rev. Alabama Power offers a variety of products, programs and tools to help you save money and energy in your home. FindLaw Codes are provided courtesy of Thomson . Using a thermal storage system in the chiller plant conserves energy, particularly when there is a significant difference in energy demand between peak and off-peak hours. Our offices are conveniently located throughout our service territory. If you have any questions, it is recommended that you contact the Inspection Services office at (251) 574-3507 or permits@mobilecounty.net prior to beginning any work. ALWAYS CONTACT YOUR UTILITY PROVIDER to make sure you meet their requirements . Applications include all areas and buildings that can use outside air for "free cooling" during a significant portion of the year. You will need your account number and your web access code. Also, you can find the account number on the top right gray section labeled Contact Us. One REC represents the environmental attributes and benefits associated with 1,000 kilowatt-hours (kWh) of electricity generated from a renewable fuel source. Insulating vertical or horizontal blinds and/or draperies can reduce heat loss and solar gain through window openings. Updating the system results in lower equipment and energy costs. Such renewable sources include solar or wind farms, low-impact hydroelectric facilities, or biomass generators. Fixtures that have state-of-the-art lamps or ballasts (T8 lamps, electronic ballasts, etc.) Yes - an account establishment charge (AEC) of $40.00 will be included on your first month's bill. If this happens, your bill could be estimated. 4. But this is the minimum service size allowed by the National Electrical Code, and you leave little room for future expansion. The tower performance goal should be .012 kw/ton or better. Quotes and receives your service account deposit. Cutouts act like a fuse and open when there is a problem with the line or a section of it. Before any work is to be done, it is advisable to check with the local power company for location of your service pole and height of your service pole. utility pole. 1.A minimum of 100 Amp 3-wire service for a single-family dwelling unit. The Alabama Cooperative Extension System, the primary outreach organization for the land-grant mission of Alabama A&M University and Auburn University, delivers research-based educational programs that enable people to improve their quality of life and economic well-being. This reminder can be set 1-5 days before the due date. To reduce costs, investigate using the economizer cycle to cool a building at night. We want your online experience to be as simple and convenient as possible. Either an eyebolt or a J-hook is acceptable and must be Complete the form or call our Business Service Center at 1-888-430-5787. Switch to an electric heat pump and save on your annual heating and cooling costs. Reductions in both peak and off-peak energy costs can be obtained by using variable speed drives on pumps, fans and compressors that operate at varying loads. PRESSURE TREATED POLE OR POST METER BASE METAL CONDUIT WEATHER PROOF PANEL, LAG BOLT TO POLE METAL OR SCHEDULE 80 PVC CONDUIT All exterior receptacles located in wet locations have listed "extra-duty" in-use covers National Electrical Code Article 406.9(B) SERVICE 100 AMP 150 AMP AMP COPPER ALUMINUM CONDUIT #2/0 MIN. Dehumidification equipment helps prevent illnesses and lost productivity. Provide all air handling units with an economizer with enthalpy control. Position pedestal so that electric meter is facing away from mobile home . Sales and delivery are limited to locations inside Sumter EMC's service territory in Georgia. Must be an Alabama Power customer that pays on time each month and has A credit, which means no disconnect notices or late payments in the previous 12 months. Also, Appalachian Power reserves the right to share any aggregated information (i.e., non-personally identifiable information) with any third parties for any reason, unless . One watt is such a small amount of power, however, that the more commonly used measurement is the kilowatt, representing 1,000 watts. For most online functions, you will also be required to create a User ID and log in to the system. Smart Neighbor by Alabama Power is your source for the highest quality energy efficient appliances, electronics and other energy efficient products. If you wish to have your payments automatically deducted from your bank account, please enroll in theAuto Payservice. Pole 40" Min. Some utility companies will bring it from the street to your ready made pole. Receive direction from our Power Delivery team to connect and/or disconnect service to your facility. You have a digital meter, and the current meter reading is displayed on the front of it. You can report your power outage online on our Outage Reporting page or by calling us at 1-800-888-2726. Contact us today. Need assistance with your business needs? Alabama Power remains committed to developing smart energy solutions that address our customers' future energy needs through high efficiency technologies, innovation and safe, clean renewable resources. Mail a check or money order - never send cash through the mail. Costs are typically low for installing, operating and maintaining these systems. Tamp dirt must be used around the pole base after every 6" of fill to secure the pole. The amount of electricity a customer uses over a period of time is measured in kilowatt-hours (kWh). Over the center portion of the street, 18' 0" minimum. To conserve energy, allow elevators to time out and shut down slowly. Assists you with getting information on the status of your service request. palki sharma upadhyay father name; richard richman net worth; uwi open campus barbados summer courses 2020. alyssa married at first sight ex boyfriend Rejected waste heat from air conditioning or refrigeration equipment can often be used to serve building needs. Contact us today. For more than 100 years, Alabama Power has acted as a reliable resource for business and a trusted partner in economic development. MLPP is your source! To be parallel they must begin and terminate together. They should idle long enough so that the power consumption is equal to or just less than power consumed in starting the motor/generator. Conduit must be installed 24 below grade up to the meter socket. #06: 11-01-18 052521 Page 5 of 8 Location of Electric Meter Pedestal Notes 1. West Florida Electric has provided the following guidelines for several types of electrical service installations for the convenience of its members.This information is strictly intended for use as a guide. Click save to finalize your un-enrollment from Paperless Billing. Whenreporting an outage, it is very helpful when you tell us you heard a loud noise because it helps us isolate the location of problems on our lines, which allows us to restore your electrical service more efficiently.