CONTINUED: (II) FIFTEEN FEET OF HYDRANTS (III) A CROSSWALK OR PEDESTRIAN RAMP, NOR SHALL IT BE STORED OR PLACED IN ANY MANNER AS TO OBSTRUCT ANY CROSSWALK OR PEDESTRIAN RAMP. Long Island City, NY 11101 (212) 839-2475 Information on restoration requirements following street openings/excavations can be found inChapter 4 Executing Work in the Street. Pedestrian RampsWhen a corner is constructed, reconstructed or repaired, pedestrian ramps must be installed in accordance with NYC DOT Standard Highway Specifications found and in accordance with the most recent revision of Drawing H-1011 from the NYC DOT's Standard Details of Construction. The New York City Department of Transportation (NYC DOT) has adopted specifications and regulations stipulating how street work must be performed in order to minimize disruption and maintain the integrity of the street surface. Please note all fields marked with an asterisk (*) on application must be completed. Full Closure Review (FCR) hold An FCR hold is automatically placed on the 90th consecutive calendar day of any full street closure. One tool highlighted in this chapter is DOTMap, a data sharing initiative that allows for better coordination of planned street reconstruction and resurfacing activities with other street excavation work. PERMITTEE SHALL NOT MOVE, DAMAGE OR DISRUPT THE BENCH. The permittee must attach a copy of the original permit to the application when it is submitted for renewal and all applicable reviews and fees will apply. Call before you dig. Projects requiring sidewalk closure may require additional permits. Further information is available in Section 2-02 (c) of Highway Rules. Office hours: 8:30 AM - 4:30 PM, The Bronx If the proposed location may be suitable, HIQA performs an inspection in order to confirm its suitability. At crossings, the height of Accessible Pedestrian Signals must be reachable by a person using a mobility device, at a preferred height of 42 inches and a maximum height of 48 inches (see, Existing foundations at traffic signal locations in certain flood-vulnerable areas are being replaced with coastal storm foundations that incorporate a square concrete pedestal raising the electrical components above some flood depths. WALKWAY MUST MEET NYCDOT SPECIFICATIONS. A Sidewalk Violation will be removed if the work has been satisfactorily completed. PRIOR TO PERFORMING ANY NON-EMERGENCY WORK WHICH IMPACTS AUTHORIZED PARKING, THE CONTRACTOR SHALL NOTIFY & COORDINATE WITH NYC DOT AUTHORIZED PARKING UNIT AT: BARCLAYS CENTER (ATLANTIC YARDS) EVENTS. Contact PEU for further information regarding the procedure to obtain initial and final approval for a transformer vault. THIS STIP IS USED FOR BPP PLANS AND REQUIRES THE CONTRACTOR TO RESTORE HALF THE ROADWAY PLUS 5'. Atransformer vaultis a subsurface structure or room that houses electrical transformers and appurtenant equipment. Bronx, NY 10462 If applicable, a permit from the Landmarks Preservation Commission (LPC) for the placement of a canopy in ahistoric district or attached to a landmarked building. THIS PERMIT INCLUDES AUTHORIZATION FOR THE STORAGE OF EQUIPMENT (OTHER THAN CRANES) AND MATERIALS ON THE JOB SITE ONLY, INCLUDING JERSEY BARRIERS IF APPLICABLE. Other conditions may apply, such as a variation in the distance and width of the job, which may increase the fee required. Fax: 212-720-3219, Manhattan SECTION24-224 ADMINISTRATIVE CODE VARIANCE GRANTED FOR HOURS AND DAYS STIPULATED HEREIN. MAINTAIN FOUR 11 FOOT LANES, TWO 11 FOOT LANES ON EACH SIDE OF THE EXISTING CENTER MALL. CONTAINMENT ONLY TO RESRTICT PARKING AND FOR STORAGE OF EXCAVATED MATERIAL/FILL. Canopy placement must be approved by the owner of the property to which the canopy will be attached. Each applicant must obtain and provide Worker's Compensation insurance in accordance with the laws of the State of New York from a licensed insurance company. City Hall, 3rd Floor For failure to comply with the terms or conditions of such permit, the Highway Rules or other applicable law in carrying out the activity for which the permit was issued; Whenever there has been any false statement or any misrepresentation as to a material fact in the application or accompanying papers upon which the issuance of the permit was based; or. WORK MAY OCCUR 24 HOURS A DAY, SEVEN DAYS A WEEK. NYC Parks & Recreation A VMS BOARD MUST BE PLACED A MINIMUM OF 7 CALENDAR DAYS PRIOR TO CLOSURE WITHIN A LEGAL PARKING SPACE ENTERING THE STREET TO BE CLOSED. THIS APPLIES TO PERMITTEES AND ALL OF THEIR SUBCONTRACTORS. With this cursor, users can click on the map to get information about a particular map layer. MAINTAIN 2 LANES SOUTHBOUND AND 1 LANE NORTHBOUND FROM 7AM-9AM M-F. CONTRACTOR MUST CALL HIQA BOROUGH OFFICE BEFORE REPLACING COBBLESTONES SO HIQA CAN MONITOR THE REPLACEMENT. The Bureau is comprised of two offices: All work within the street requires a NYC DOT permit to minimize construction impacts. VIOLATORS SHALL BE FINED AND PERMITS WILL BE SUSPENDED FOR NON COMPLIANCE. Commercial Refuse Container Carting Companies*: You must enter your Business Integrity Commission (BIC) License or Registration number. THE TRAFFIC STIPULATIONS ON THIS PERMIT DO NOT GO INTO EFFECT AS LONG AS THE CONTRACTOR CONTINUES TO WORK NON-STOP, AROUND THE CLOCK, TO CORRECT THE EMERGENCY SITUATION. 16 Court Street, 15th floor The applicant must obtain CGL insurance policies written by companies that may lawfully issue such policies, with an A.M. Best rating of at least A-VII or a Standard & Poor's rating of at least AA. THE PERMITTEE MAY BE REQUIRED TO PAY STATION DEACTIVIATION AND/OR REMOVAL CHARGES. THE PERMITTEE MUST HAVE APPROVAL FROM NYCDOT STREET LIGHTING FOR INSTALLATION/REPLACEMENT OF POLES. Corner TreatmentThe two slope lines meeting at the intersection of the two building lines must drop from a common point at the building corner toward their respective curbs at a rate within the limits prescribed in the Highway Rules. WAIVER TO WORK DURING 2010 HOLIDAY EMBARGO GRANTED FOR THIS PERMIT. Street excavations also adversely affect the condition of the streets, reducing the number of years the pavement would otherwise be expected to remain in good or excellent condition following resurfacing or reconstruction, and increasing repair and life cycle costs for the city. By eliminating manual steps, most permit requests now may be approved and issued within 1-2 business days. Key principles for effective coordination include: Provide Notice of Planned Street work at Earliest OpportunityThe basic principle of providing adequate advance notice is the greater the disruption, the longer the notice period needed. Form must be notarized. Fax: (718) 993-3077. BLKRES-RESTORE AS PER SKETCH #4 OF DOT'S PROTECTED STREET RESTORATION REQ'MENTS. For non-DDC capital projects, the applicant may contact the Permit Office to request release of a CPO hold. It could be because it is not supported, or that JavaScript is intentionally disabled. To request release of the hold, the permittee must take out a permit of record for the work that was performed without a permit and then contact HIQA to submit a copy of the permit. Attn: Forestry SECTION 24-224 ADMINISTRATIVE CODE VARIANCE GRANTED FOR HOURS AND DAYS STIPULATED HEREIN. Click here to download. Included are topics about Policy, Procedures, Specifications and Design Standards (Manuals, Guidelines, and Computer Aided Design and Drafting drawings). During the processing of the permit, if there is a hold, the applicant is notified of the type of hold and the steps the applicant must take to release the hold. POST "NO STANDING 7AM- 6PM M-F" SIGNS ON THE NORTH CURB. While the files are presented here in .pdf format, the source drawings are actually produced as MicroStation .dgn files. Queens Sub title REVISED DRAWINGS COVERING PEDESTRIAN RAMPS Agency Design and Construction, Department of (DDC) Additional creators DDC & DOT Subject Traffic Safety Transportation Streets and Highways Report type STLRES-RESTORE AS PER SKETCH #3 OF DOT'S PROTECTED STREET RESTORATION REQ'MENTS. YOU MUST SURVEY THE SITE. Questions regarding permit registration or application processes can be directed to any Permit Office. NYC DOT registers permittees, and coordinates and issues permits for construction-related activity on streets. The city has master revocable consent agreements with electric utility companies that allow them to occupy and use city property for transformer vaults. Chapter 2 describes processes and tools to enhance advance planning and coordination of street work between NYC DOT's own capital resurfacing and reconstruction programs and the street infrastructure work of other stakeholders, especially those that perform a large number of street excavations. Connecticut Department of Transportation Division of Traffic Engineering Email: DOT.TrafficElectrical@ct.gov. NYC DOT is working to enhance the coordination of major planned work that impacts the streets with utility companies and other entities that perform street excavations. The first option (see Diagram 1) is by using the DOT on-line NYCStreets Permit Management system. ON STIP WAGE02), WORK NORTHBOUND 7AM-4PM M-F AND 9AM-6PM SAT/SUN. 811 or 800-272-4480. These forms may also be found inAppendix B, Forms. COORDINATE CONSTRUCTION ACTIVITY WITH THEATRE GROUPS PRIOR TO WORK. A BIKE SHARE STATION IS/WILL BE LOCATED ON THIS STREET. The latest edition is available for purchase for $50 from the Office of the Agency Chief Contracting Officer, 55 Water Street, Ground Level, New York, NY, 10041. FULL SIDEWALK CLOSURE WITH WALKWAY IN ROADWAY, WEEKDAY NIGHTS 7PM TO 6AM AND FRI NIGHT 7PM THRU MON 6AM. WHEN APPLICABLE, NYCT OR PRIVATE BUS COMPANIES MUST ALSO BE NOTIFIED. A one-time Street Opening Permit must also be obtained to install the poles that support the canopy. ALL WORK TO MEET OR EXCEED NYC DOT STANDARDS. LOCAL AND EMERGENCY ACCESS MUST BE PROVIDED FROM EACH END OF THE BLOCK AT THE INTERSECTIONS WITH USE OF FLAGGERS AND SIGNAGE. CONNECT WITH US. CLOSURE GRANTED AT REQUEST OF SCA LETTER. THE SITE OF YOUR PROPOSED WORK MAY BE WITHIN 100FT OF A BRIDGE STRUCTURE. IF WORK IS MORE THAN 100FT AWAY, YOU MUST FORWARD CERTIFICATION. Tel: (718) 298-7300 SECTION24-224 ADMINISTRATIVE CODE VARIANCE GRANTED FOR HOURS AND DAYS STIPULATED HEREIN. If any proposed work is within 100 feet of a bridge or structure, applicants must submit a scaled drawing showing the work and exact location. Print his/her name and title and provide a signature. PRIOR TO BEGINNING ANY WORK, TO ENSURE THAT YOU RESTORE THE AREA IN-KIND, YOU MUST CONTACT THE NYCDOT TRAFFIC OPERATIONS DIVISION TO OBTAIN THE RESTORATION PLANS FOR THIS ROADWAY INCLUDING COLOR MARKINGS AND ANY OTHER INSTALLATION REQUIRED. Real-Time Traffic Conditions & Cameras. 280 Broadway, 3rd Floor IF LOCATION IS IN SCHOOL ZONE AS SPECIFIED IN SCHOOL STIPULATION, MAY ONLY WORK 9 AM TO 2 PM MON TO FRI WHEN SCHOOL IS IN SESSION (083 STIPULATION). However, if extraordinary conditions are present, the applicant may be asked to meet with OCMC. ONE LANE MAY REMAIN CLOSED, FOR CONCRETE CURING ONLY, FOR A MAXIMUM OF 48 CONSECUTIVE HOURS MONDAY TO FRIDAY IF WEEKDAY WORK HOURS ARE GRANTED, OR FROM 12:01AM SATURDAY THROUGH 6AM MONDAY IF WEEKEND OR NIGHTLY (7 NIGHTS) WORK HOURS ARE GRANTED. Worker's Compensation Insurance. Fax: 718-596-2609, Central Office (NAME AT LEAST 2). MICROSTATION SHEET MODELS. New York, NY 10013 New York, NY 10038 To request release of a COB hold, the applicant must contact the HIQA borough office in the borough in which the proposed work is to be performed to arrange for an inspector to visit the work site prior to the start of the work. Report a problem. Fax: (718) 699-7491 Payment of the waiver request fee, as specified in the Highway Rules, Section 2-03, does not guarantee that approval to work during the embargo period will be granted. The purpose of placing a street in protected status is to maintain the integrity of a new street surface. In some cases, applications and supporting documentation must be submitted in person. United States Department of Transportation, Book of Standards for Highways and Incidental Structures, Construction and Traffic Standard Details, Design Standards and Specifications Drawings, PDF, DGN (freely available login required), PDF, DGN (individual division details also available). THIS PERMIT REQUIRED AN ODV PERMIT WHICH MUST BE IN THE VEHICLE FOR INSPECTION BY A POLICE OFFICER AND OR AUTHORIZED GOVERNMENTAL EMPLOYEE UPON REQUEST. If all information is satisfactory the applicant is approved and the system auto-generates an email which is sent to the applicant with the EAN. ALL WORK OPERATIONS MUST BE RESTRICTED WITHIN 11 FEET OF THE NORTHEAST QUADRANT OF THE INTERSECTION. During the final design stage of a city project, DDC will also hold a series of alignment meetings with the utilities and other agencies to inform them about proposed changes to the location of street infrastructure that would require facility relocation. Different from DOB, DOT plans requires 600 PSF live loads on all sidewalk doors, gratings, covers and vault structures. A collection of manuals, specifications, and other publications relevant to the Office of Traffic Operations. 1932 Arthur Avenue, 5th Floor 4. Signs must be conspicuously displayed and face the nearest curb line. BROOKLYN BRIDGE CONTRACT 6 WILL REQUIRE NUMEROUS OVERNIGHT AND WEEKEND CLOSURES OF INBOUND VEHICULAR TRAFFIC. The construction, alteration or repair of any building vault or transformer vault requires a permit from NYC DOT. NO OCCUPANCY OF ROADWAY OF PERMITTED AFTER WORKING HOURS. This list is provided as a reference tool, for informational purposes only, and is not an exhaustive list. Policies; Accessibility; About CT; MUST COMPLY WITH DEP NOISE REQUIREMENTS. CONTRACTORS SHALL NOTIFY POLICE, FIRE, EMS, COMMUNITY BOARDS, AND ABUTTING PROPERTY OWNERS 48 HOURS PRIOR TO CONSTRUCTION. DOT's preference is that there is no split in Pedestrian Flow. 4.13 C OF THE DEPT. See the most recent version of Drawing # H1029 of the NYC DOT. New York, NY 10038 Work must begin within two hours after obtaining an Emergency Street Opening Permit Number and must be performed around the clock until the emergency is eliminated, unless otherwise directed by NYC DOT. The permittee may apply for a renewal online, or in-person by accessing either theApplication to Renew Permitsor theApplication to Renew Governmental Permit(s). Your permit(s) must be reviewed and released by the OCMC Office. NYC DOT also routinely meets with utility companies and others who perform street excavations to inform these organizations of upcoming events and major construction projects with which NYC DOT is involved. SECTION 6: LEGAL ENTITY PERSONNEL: OFFICERS/ DIRECTORS/ MANAGING AGENTS/ OWNER/ PARTNERS /MEMBERS /INDIVIDUALS, ETC. 211th Street and 23rd Avenue, Queens Riverside Drive, Manhattan Benefits Enhances pedestrian safety and accessibility by reducing crossing distances and providing refuge for pedestrians to cross road in stages Calms traffic, especially left turns and through-movements, by narrowing roadway at intersection NYC DOT Standard Highway Specifications, May 16, 2022 NYC DOT Standard Details of Construction, June 6, 2022 Sewer and Water Main NYC DEP Standard Sewer and Water Main Specifications, August 8, 2022 NYC DEP Specifications for Trunk Main Work, July 2014 NYC DEP Water Main Standard Drawings, December 2020 NYC DEP Sewer Design Standards, August 2018 The Street Works Manual is a tool intended to increase the performance of both city government and the private sector in this regard. 59 Maiden Lane, 34th Floor More information on this and other "holds" that may be placed on permit applications can be found in, Protected street status for intersections, Active/Future start dates of projects for segments, Active/Future start dates of projects for intersections. THE CONTRACTOR SHALL MAINTAIN (1) EITHER A 5-FOOT CLEAR SIDEWALK FOR PEDESTRIAN ACCESS AT ALL TIMES,(2) A PROTECTED WALKWAY IN THE ROADWAY MEETING ALL NYCDOT SPECIFICATIONS AND RAMPED AT ENTRY TO SIDEWALK FOR HANDICAPPED ACCESSIBILITY OR,(3) A NYCDOB APPROVED PROTECTED WALKWAY THORUGH THE BUILDING. It draws from a wide range of resources and experience to present a coherent set of choices for street design. To this end, the Street Works Manual is a resource for all parties that perform work in New York City streets, from utilities and contractors installing, replacing and repairing underground infrastructure to developers replacing roadways and sidewalks adjacent to building sites and homeowners performing their own sidewalk repairs. NYCityMap is the city's web-based interactive mapping application. the Manual on Uniform Traffic Control Devices, a publication issued by the Federal Highway Administration containing the basic principles that govern the design and use of traffic control devices for all streets, highways, bikeways, and private roads open to public travel. For questions, Mon-Fri 8:30 AM until 5:00 PM. To request authorization for the installation of a canopy, an applicant must initiate the process at the HIQA office in the borough where the proposed canopy will be located. RESTORE CONCRETE BASE. NOVs carry a monetary fine and place the matter under the jurisdiction of the New York City Environmental Control Board (ECB). WORK 10AM-3PM TO SET UP WORK AREA INCLUDES SHIFTING MOVING LANE TO CENTER STRIPED AREA AND ESTABLISING WORK ZONE ONCE WORK ZONE ESTABLISHED MAY WORK 24/7 WITHIN WORK ZONE/DRILLING ALL WORK IN ACCORDANCE WITH DRAWING MPT-3 8/28/07. Permit applications near bridges are subject to approval by the Division of Bridges. Coordination aims to reduce street excavation work on recently repaved streets. DURING WORKING HOURS SIDEWALK MAY BE CLOSED PROVIDED FLAGGERS ARE AT EACH INTERSECTION AND AT BOTH ENDS OF WORK SITE TO SAFELY CROSS PEDESTRIANS. Tel: (718) 993-6110 Copy of E.I.N. The contact information and hours of operation for all Permit Offices can be found in Appendix C, NYC DOT Contact Information. Sidewalk Construction Permits are generally taken out by entities that need to perform work on sidewalks, including developers, contractors, and private homeowners (for sidewalk repairs and only if performing the work themselves). WHEN THE LANDSCAPE IS WITHIN THE RIGHT OF WAY OF A LIMITED-ACCESS ARTERIAL HIGHWAY, WRITTEN APPROVAL FROM THE NYCDOT OCMC- HIGHWAYS IS REQUIRED.WHEN THE LANDSCAPE IS WITHIN THE RIGHT OF WAY OF A PUBLIC. If it is determined to be unfeasible, the pending permit will be rejected. Prior to any permit revocation, NYC DOT will give the permittee an opportunity to be heard with not less than two days' notice. Download about 619 . Drawings are available in various formats including PDF (Acrobat), DGN (MicroStation Design File), DWG and DXF (AutoCAD Drawing), and other image types (TIF, DPR). A list of partially and fully restricted streets where canopy placement is limited or prohibited can be found in the Highway Rules, Section 2-04(f). DOT Street Lighting's Standard Drawings Book [PDF] includes Standard drawings for elements in the lighting catalogue. 66 John Street, 10th Floor An application for a Street Opening Permit on a protected street will automatically be placed on a Street Arterial Maintenance (SAM) hold if the proposed work is to start within 18 months of the street being resurfaced or reconstructed. FULL WIDTH OF ROADWAY SHALL BE OPENED TO TRAFFIC WHEN SITE IS UNATTENDED. All of these signs are metal and include the agency name and sign code. NYC DOT accepts and processes applications by mail for sidewalk repair performed by private homeowners. - see, UTILITY COVER EMBARGO 0700-1000 1600-2000 WEEKDAYS, UTILITY COVER EMBARGO 0700-1000 1600-1900 WEEKDAYS, UTILITY COVER EMBARGO/HOLIDAY EMBARGO 0600-2400 WEEKDAYS/WEEKENDS. ALL OVERDIMENSIONAL CRANE/TRAILERS REQUIRE AN ADDITIONAL PERMIT FROM THE NEW YORK CITY DEPARTMENT OF TRANSPORTATION DIVISION OF BRIDGES. This category of permits applies to authorizations and permits required to place a canopy* over the sidewalk. CPI holds are regularly released by the borough Administrative Superintendent of Highway Operations (ASHO) if the proposed work does not interfere with the in-house street resurfacing operation. SPECIAL PROCEDURES TO FOLLOW WHEN RESTORING TRENCHES IN RECENTLY PROTECTED RECONSTRUCTED ROADWAYS: 1. New York State Department of Transportation coordinates operation of transportation facilities and services including highway, bridges, railroad, mass transit, port, waterway and aviation facilities . When a need exists to develop special details similar to the standard details, consultants may request copies of the .dgn files from their NYSDOT Project Managers. Who has been found liable by a court or in a proceeding before the ECB of a violation of a rule or order of NYC DOT or the terms or conditions of a permit issued by NYC DOT or other applicable law, which violation caused an imminent peril to life or property. WORK SATURDAY, 8 AM-6 PM AND SUNDAY 9 AM-6 PM. Applicant Information (Corporation, LLC or LLP), 1C. Municipal Building 8:30 AM to 4:30 PM, South Queens (south of the LIE) If there is no hold, the permit is issued to the applicant after appropriate payment is received. PEU also accepts applications to abandon existing vaults that are no longer in use. Emergency work will not be placed on hold and shall proceed in accordance with Highway Rules, Section 2-11 (g). See, Utilize recycled content in paving materials. Additionally, High Density Polyethylene (HDPE) conduit, a more cost-effective material that is not susceptible to corrosion from residual salt water after storm surge events, is replacing galvanized steel for all signal locations and street light locations in flood-vulnerable areas. Upon a satisfactory inspection, the hold(s) will be released. These applications can be submitted online using NYCStreets. An online permit processing application significantly enhanced the efficiency of NYC DOT permitting operations. FULL SIDEWALK CLOSURE ALLOWED FOR SIDE WALKS LESS THAN 15 FT WIDE. Keywords: Portable, Sign, Support, Temporary, Wooden, Keywords: Portable, Temporary, Rumble Strips, Keywords: Closure, Encroachment, Lane, Mowing,Shoulder, Special, ISSUED. While the situation is evolving, the agency remains committed to applying the principles and proven treatments included in the Street Design Manual to support the health and safety of all New Yorkers. ALL SIDEWALKS IN C4-4 THROUGH C4-7, C5 & C6 COMMERCIAL DISTRICTS, AS DEFINED IN THE NYC ZONING RESOLUTION SHALL BE OF PIGMENTED CONCRETE WITH SAW-CUT JOINTS AS SET FORTH IN SEC. Kew Gardens, NY 11415 PHONE#508-429-6023. LANE CLOSURES MAY NOT OCCUR WHEN TWO LANE CLOSURES OCCUR ON GOWANUS OR ON RAMPS LEADING TO 3RD AVENUE. 30-30 Thomson Avenue, 4th Floor HIQA also releases many holds. View more information and instructions for obtaining a revocable consent. With advance notice of proposed excavation work, NYC DOT can sequence the timing of the large number of roadway and utility works being undertaken across the city. 1150 Clove Rd. Permittees can use these maps to make informed decisions while planning new projects. (718) 391-1937 There is one permit application form that covers Street Opening, Building Operations/Construction Activity, and Sidewalk Construction permits for non-governmental work. Street Opening, Building Operations/Construction Activity, Sidewalk Construction, and Canopy Permits are reviewed and stipulated by OCMC staff. COORDINATE WITH NYSDOT PRIOR TO WORK. NOTARIZE THE FORM. The Poles and Luminaires chart identifies which combinations of poles and luminaires are permitted. (212) 839-9666 55 Water Street, New York, NY 10041 The milling and resurfacing schedules are organized by borough and are sent electronically each week to utility companies and other city agencies. AN EMBARGO WILL BE IN EFFECT FOR THIS WORK AREA FROM 7/28/14 THRU 8/16/14 ALL ROADWAY/SIDEWALK OPENINGS WHICH CANNOT BE COMPLETED INCLUDING BACKFILL AND RESTORATION PRIOR TO 7/28/14 SHOULD NOT BE STARTED. Due to upcoming major building rehabilitation at 1400 Williamsbridge Road. In some cases, applications and supporting documentation must be submitted in person, however the majority of permit applications may be submitted online. PROVIDE 5 FEET FOR PEDESTRIANS ON SIDEWALK OR IN CURB LANE. Standard Sheets (US Customary) > Doing Business with NYSDOT - (business-center) > Engineering > CADD Info > Drawings > Standard Sheets (US Customary) US Customary Standard Sheets Standard Sheets are available both in the US Customary units accessible below and in Metric units. 42 Broadway DOT SIGNALS APPROVED PLANS. NYC DOT coordinates street opening and other construction on streets. NYC ADMINISTRATIVE CODE, 19-142, WORKERS ON EXCAVATIONS: A PERSON TO WHOM A PERMIT MAY BE ISSUED, TO USE OR OPEN A STREET, SHALL BE REQUIRED, BEFORE SUCH PERMIT MAY BE ISSUED, TO AGREE THAT NONE BUT COMPETENT WORKERS, SKILLED IN THE WORK REQUIRED OF THEM, SHALL BE EMPLOYED THEREON, (CONT.