Buildings that were going to get a new life after the Games were permanent buildings. The stadium also hosts events such as the UK athletics and various bands and artists throughout the year. This presentation looks at aspects of the engineering innovation and ground-breaking use of long span elements. The Lower Lea Valley had poor soil conditions, but the soil was cleaned up on site. Stratford lacked proper infrastructure, and the environmental quality was poor. In 2010, five LABC teams from London Boroughs of Newham, Hackney, Waltham Forest, Tower Hamletsand Greenwich came together to form JLAB a joint venture organisation which provided the buildingcontrol service on the Queen Elizabeth Olympic Park. Please note this website uses cookies. Im having difficulty uploading my photographs for my Awards entry. In World Economics, 16, issue 1, p. 35-42, https://EconPapers.repec.org/RePEc:wej:wldecn:606. 0 Its 100% free. Economic - due to improved infrastructure, it has better connections to the rest of London. Furthermore, the construction jobs were only temporary. From the point of view of the government, some targets were met. Document Information This angered the public as the money also came from taxpayers. Beijing's 2008 Olympics got $3.6 billion in revenue, compared to over $40 billion in costs, London spent $18 billion and earned $5.2 billion in 2012. . The construction of all the buildings creates 1,500 jobs, with at least 30% of those for local residents. Faster commuting times, more time spent on family and friends, to and from Stratford. The five Host Boroughs surrounding the Olympic Park provided nearly a quarter of the workforce throughout the project. . Afterwards, it is predicted that this would support another 2,500 jobs. Be perfectly prepared on time with an individual plan. Why can I choose who does my building control? It involves University College London (UCL), the BBC, Sadler's Wells, the V&A (Victoria & Albert) and the London College of Fashion. The olympics brought a 9 billion investment into London and generated 10 billion in extra income for the uk economy All of the Olympic venues were sold, many old buildings, e.g the Olympic media centre for 300 million, now offices 470,000 over seas tourists The Olympic stadium costed 701 million 3 times its estimate [3]. Fig. Email: s.dodd@uel.ac.uk Abstract With so many government sponsored mega-project failures exposed in the press, this Businesses were relocated to make space for the Olympic Park. This angered the public as the money also came from taxpayers. 20 pages. The Olympic Stadium was estimated to cost 701 million, three times the original estimate. The 2012 Olympic and Paralympic Games led to major construction and regeneration programs controlled by the Olympic Delivery Authority. What type of building regulations application do I need? Green areas were created along the river banks. With events ranging from Premier League football via anchor tenant West Ham United, Major League Baseball, concerts and global athletics events, the stadium turned to PTI to ensure that consumer experience could flexibly meet the demands of the different event types, ultimately aiming to achieve a personalized experience for any attendee of any event. Integrated Design Case Study 2178 - 001 INTEGRATED TECHNOLOGY FALL SEMESTER 2017 **NEW** FAQs on Approved Inspector insurance issues, How to get building control approval and book inspections, How to avoid cowboy builders (and how LABC can help). TRUE or FALSE:The Olympic Village was converted into 2,800 flats and apartments, and new developments such as The International Quarter will provide 7,000 additional homes on the edge of the park. http://www.olympic.org/Documents/Reference_documents_Factsheets/London_2012_Facts_and_Figures-eng.pdf Interesting facts in general. 6bn was spent on redevelopment by the Olympic Development Authority. It had one of the most deprived communities in the country, unemployment was high, and health levels were poor. A concept inspired by the fluid geometry of water in motion, creating spaces and a surrounding environment in sympathy with the river landscape of the Olympic Park. East London, and mainly Stratford, was regenerated for the 2012 Olympics, costing around 10 billion. How can I get further information/updates? Furthermore, many jobs did not go to locals and construction jobs were temporary. Approved Document B: Fire Safety Volumes 1 & 2, Approved Document C: Site preparation and resistance to contaminants and moisture, Approved Document E: Resistance to the passage of sound, Approved Document G: Sanitation, hot water safety and water efficiency, Approved Document H: Drainage and waste disposal, Approved Document J: Combustion appliances and fuel storage systems, Approved Document K: Protection from falling, collision and impact, Approved Document M: Access to and use of buildings, Approved Document P: Electrical safety - Dwellings, Approved Document Q: Security - Dwellings, Approved Document R: Physical Infrastructure for High Speed Electronic Communications Networks, Approved Document L: Conservation of fuel and power, Building Regulations - Regulation 7: Materials and workmanship, Wales Approved Document K: Protection from falling, collision and impact, Wales Approved Document Part B: Fire Safety, Wales Approved Document Part C: Site preparation and resistance to contaminants and moisture, Wales Approved Document Part D: Toxic substances, Wales Approved Document Part E: Resistance to the passage of sound, Wales Approved Document F: Means of ventilation, Wales Part G: Sanitation, hot water safety and water efficiency, Wales Approved Document H: Drainage and waste disposal, Wales Approved Document J: Combustion appliances and fuel storage systems, Wales Approved Document L: Conservation of fuel and power, Wales Part M: Access to and use of buildings, Wales Approved Document P: Electrical safety - Dwellings, Wales Approved Document Q: Security - Dwellings, Wales Approved Document R: Physical Infrastructure for High Speed Electronic Communications Networks, Wales Approved Document to support regulation 7: Materials and workmanship, Mandatory Fire Suppression for Wales - A Technical Guide, Register your interest in the apprenticeship degree webinar, I'm not sure which training course is right for me. London's Olympic Park has been regenerated by changing the functions of the infrastructure of the Olympic Games to serve the public and the local residents. The Westfield Stratford shopping centre created 10,000 permanent new jobs from day one, including 2,000 for local people who were previously unemployed. The infrastructure was significantly improved for the whole area. When the Metropolitan Building Act restricted dangerous and toxic industries from operating in the metropolitan area, many businesses relocated to the river banks. What if I haven't received the joining instructions? Which building control authority should I use? Appligent AppendPDF Pro 5.5 that it was one of the most deprived areas in England due to the deindustrialisation that came after the industrial revolution. endobj Urban regeneration is when an urban area, such as a town or a city, is transformed by refurbishing buildings, building or improving infrastructure and creating landscapes. Products. Regeneration of Lea valley was started in 2009 in time for the 2012 Olympic games. <>]/P 321 0 R/Pg 504 0 R/S/Link>> All of the Olympic venues have been sold, providing an extra income. London Olympic Stadium Case Study. Buildings that were not getting a new life on-site were temporary ones, and they were relocated elsewhere after the games. I don't have the right permission for building work - what do I do? 485 0 obj <>]/P 329 0 R/Pg 504 0 R/S/Link>> 7 0 obj The aquatics centre and its 50m pool can now be used by the community, schools and athletes alike. Sustainable and biodiverse vegetation that is suited for an urban environment was used. Can Approved Inspectors continue without the required insurance? Stop procrastinating with our smart planner features. All this was about to change, though, with the UK's bid for hosting the 2012 Olympics Games, including the Paralympics, to be hosted in London. The Illusory Economic Gains from Hosting the Olympics World Cup. The athlete's village was turned into housing which was said to be affordable. The Olympic Park, renamed Queen Elizabeth Olympic Park after the Olympics and Paralympics, was built for the 2012 Summer Olympics and Paralympics. 2017-04-07T11:48:28-07:00 <> The site was home to the 1964 Olympic stadium, a 54,000-capacity venue, which many argued could be upgraded and reused, in the same way that successful refurbishments had been made to the . Economic - construction costs were higher than estimated. TRUE or FALSE: The Olympic Stadium was estimated to cost 701 million, three times the original estimate. Prior to construction, the Olympic Delivery Authority (ODA, 2015) excavated and cleaned more than 2.3 million cubic metres of contaminated soil. I want other people to contribute to the entry form. The creation of containerised cargo and other technological changes. Because of the deprived status, the existing waste and industrial lands available, and the close location to the City, Stratford was chosen by the UK for the 2012 Olympic and Paralympic Games. 380 businesses relocated away from park to make way for Olympics, Cost of living in the area for poorer people will increase. Some reasons were the overseas competition, loss of the British Empire, and insufficient industrial and technological innovations. The city's regeneration helped to rebuild the area, but its impact adversely affected some of its population. The Aquatic Centre is London Aquatics Centre and is open to the public. StudySmarter is commited to creating, free, high quality explainations, opening education to all. There were advantages and disadvantages to this regeneration. Fig. Case study Olympic Stadium transformation 25 June 2015 Re-development of the Olympic Stadium included the addition of the world's largest cantilevered roof Project details Technique: Bottom driven mini-piles and driven pre-cast piles Location: Stratford, London Value: Mini - 950k; Precast - 120k Duration: 12 weeks Completed: July 2014 The unique appearance created some challenges in making the stadium feasible. They were subsequently employed to help theproject team convert other buildings on the site. 332 0 obj The UK won the bid over Paris, New York City, Moscow and Madrid. <> Free and expert-verified textbook solutions. What are LABC's booking terms and conditions? endobj https://journalistsresource.org/studies/government/infrastructure-government/economic-and-cultural-benefits-of-the-olympics-research-roundup Accessed 17 January 2018. I've started an entry but don't know how to get back into it! Find out how we can help. Lerne mit deinen Freunden und bleibe auf dem richtigen Kurs mit deinen persnlichen Lernstatistiken. Steel. Remember to attempt a counter-argument and rebuttal, and that this is a formal letter so you should be using formal business language. Particular care was taken in rejuvenating the original industrial brownfield site of 560 acres. It seems likely that there was a political influence in the decision such as the French president insulting the Finnish delegation by complaining about the quality of Finnish food. Waterways were improved so they would be suited for the new Olympic Park. Create and find flashcards in record time. East Village is one of the most sustainable communities in the UK. Why was the Olympic Park built over Stratford, Bow, Leyton and Hackney Wick? <>]/P 171 0 R/S/Link>> Brownfield is disused and derelict land that was previously developed. The Department of Education provided GBP 65 million to encourage efforts by physical education teachers to organise competitive sports, embed best practice and train primary school teachers. Name Of Club: Al Ahli Sports Club Location: Al Nahda 2, Dubai,UAEArea: 230275.98m2. Help - we didn't get permission for our building work! The venue hosts sports events other than football, and staged matches of the 2015 Rugby World Cup, the Athletics World Championships in 2017 and Major League Baseball in 2019. The Stadium is located in the Olympic Park in Stratford, London, on a 40 hectare, island that resembles a diamond in the south area of the Olympic park. Stratford ultimately went from being a deprived community to a more affluent place to live. The following venues were built for these Games: After its reopening, it was given the name Queen Elizabeth Olympic Park, to commemorate the Diamond Jubilee of Queen Elizabeth II, although it is not an official Royal Park. Negatives: The Olympic stadium is estimated to have cost 701 million pounds, almost 3 times the original estimate. <>]/P 320 0 R/Pg 504 0 R/S/Link>> endobj endobj The London Olympics have brought many positive things to Stratford, although there have also been some negatives. The waste and industrial land were cleaned. Social - new homes were built, with around 1/3 of those becoming more affordable. The industrial revolution was such an important part of British history that it was even included in the opening ceremony of the Summer 2012 Olympics and Paralympics, where there were scenes of rural areas transformed into industrial areas with many dancers representing workers in the factories. https://www.rgs.org/NR/rdonlyres/1E506FE2-3179-439C-81F2-B43D0B97D058/0/CGT_NetRaising_8Olympicpresentation.pdf Accessed 17 January 2018. What people are saying about our conferences and training. Masterminds of Construction: LABC (Video). The Olympic Park has been renamed Queen Victoria Olympic Park after the 2012 Games. [4], Overall, do you think that the Games were a success? It was renamed Queen Elizabeth Olympic Park and is open to the public for free to enjoy. This closure led to massive unemployment and social problems across East London, and Stratford was no exception. Education and sports - the Olympic Stadium is now used by West Ham United F.C. The first Join In weekend (encouraging volunteerism as the profile was increased from volunteers at the Olympics), in August 2012, featured over 6,000 events. What services do we offer on the website? Olympics and their economic impact: Updated research roundup. The London Olympic Athletes Village is the largest sustainable homes project in the UK. The Olympic stadium began construction in May 2008 and ended in March 2011. The success of the Olympic Park is assessed in many different ways; one way was the ambitions and targets set by the government. There are a lot of green spaces, from the Queen Elizabeth Olympic Park to the Hackney Marshes. On this page, we look at the London Olympics of 2012 as a case study of the costs and benefits for one country hosting an international sports event. This leads to a loss of jobs which in turn often causes poverty. The conversion included a new roof, a new perimeter wall, extensions to the hospitalityareas, new flexible seating and an upgrade to the building fabric. <>]/P 318 0 R/S/Link>> However, with Stratford being more affluent, it is still unaffordable to live for the poor(er) people of the community, In East London, about 7 miles from Central London. Looking at the success of the Olympic Park from the point of view of the local residents may give another result. 3 - Olympic Stadium housing West Ham United F.C. Do I need a building regulations application (specific projects)? The facilities that were built for the Olympic games will also be used in the future in phase with the 2030 sustainability guide to Queen Elizabeth Park. The initial estimate of GBP2.2bn was totally wrong and the games eventually cost around GBP10bn! The Montreal Olympic Stadium cost $3,107,148,600 to build. Introducing LABC Trainee of the Year 2016: Jack Pritchard! Includes a global database of 30k deals and a growing archive of sport sponsorship activation case studies. So, they built a 25,000 seat stadium and the plan was to add on a temporary structure for an additional 50,000 seats . The Olympic Stadium was estimated to cost 701 million, three times the original estimate. What do I do if I want to attend a course but there are none in my region? 0000002591 00000 n NEC3 case study - London 2012 Olympic Velodrome. More than 9 billion of investment was brought to East London, with the majority of that money spent on transport. Dugan, E. 2013. 300,000 plants were planted in the Olympic Parks wetland area. Care was taken in building the park, transporting materials, and planting vegetation. ", Fig. Chobham Academy, a school for students aged 3-18, was able to open in the East Village. endobj Why not consider a career in building control with the opportunity to progress? The London Legacy Development Cooperation delivered the Queen Elizabeth Olympic Park which hostedthe London 2012 Olympic Games and is responsible for bringing it back in to use. "Who's who: Political credit from London Olympics".